Apply Online for New Domestic Gas Connection 2025
If you are planning to apply for a new domestic gas connection in Pakistan in 2025, this guide is for you. The Sui Northern Gas Pipelines Limited (SNGPL / SNGC) has presented a major policy alteration this year. Rendering to the latest updates, all new domestic gas connections are now being provided on LNG (Liquefied Natural Gas) basis only. Old-style natural gas connections are no longer available for new candidates. The whole procedure has been shifted online, making it more transparent, faster, and easier for families across Pakistan.
Quick Information Table – Apply Online for New Domestic Gas Connection
| Field | Details |
|---|---|
| Program Name | SNGPL Domestic LNG Gas Connection 2025 |
| Start Date | January 2025 |
| End Date | Ongoing (No announced closing date) |
| Assistance / Facility | New LNG-based domestic gas connection |
| Application Method | Online only |
What’s New in SNGPL Domestic Gas Connections 2025?
In Apply Online for New Domestic Gas Connection 2025, SNGPL has completely revised its domestic gas rule. The most significant change remains the shift from natural gas to LNG for all new residential influences.
Key updates include:
- All old natural gas applications are cancelled
- Manual or office-based applications are no longer accepted
- Separate online portal for applicants with old demand notices
- Updated fee structure based on house size and urgency
- Submission of neighbor’s gas bill is mandatory for verification
This policy aims to manage gas shortages and ensure fair distribution.
Online-Only Application Process for LNG Gas Connection
SNGPL now accepts Apply Online for New Domestic Gas Connection 2025 for domestic LNG connections. This helps reduce corruption and delays.
Steps to Apply Online:
- Visit the official SNGPL LNG online application portal
- Select Domestic LNG Connection
- Enter your CNIC, mobile number, and property details
- Upload required documents
- Submit the form and save your reference number for tracking
Make sure all information matches your CNIC and property records.

Required Documents for LNG Domestic Gas Connection
You must upload the following documents carefully. Incomplete applications are usually rejected.
| Document | Purpose | Notes |
|---|---|---|
| Valid CNIC | Identity verification | Must be active and clear |
| Property ownership proof | Residence verification | Registry, allotment letter, or NOC |
| Neighbor’s gas bill | Pipeline availability check | Recent bill required |
| Photographs (if asked) | Meter installation | Property front view |
Tip: The neighbor’s gas bill is very important. Without it, your application may not be processed.
Priority Processing for Old Demand Notice Holders
If you received a demand notice before 2025, SNGPL has provided a priority system for you.
Important points:
- Use the separate portal for old demand notices
- No need to submit all documents again
- Processing is faster compared to new applicants
Always check that your CNIC and property details match old records.
Category Change: Natural Gas to LNG
Earlier, domestic users could apply for natural gas. Now:
- All new connections are LNG-based
- Old natural gas requests are invalid
- Reapplication under LNG category is required
Why LNG Was Introduced?
- Increasing gas demand in cities
- Better supply management
- Cleaner and efficient energy source
- Easier billing and monitoring
New Fee Structure for LNG Domestic Connections 2025
SNGPL has revised the fees based on property size.
| Property Size | Standard Fee (PKR) | Urgent Fee (PKR) |
|---|---|---|
| Up to 5 Marla | 21,500 | 25,000 |
| Up to 10 Marla | 23,500 | 27,000 |
| Urgent Category | — | 25,000–27,000 |
Note: Urgent processing is faster but subject to workload and area availability.
Step-by-Step LNG Meter Registration Process
After approval, the meter installation process starts.
- SNGPL schedules a technician visit
- CNIC and property are re-verified
- LNG meter is installed
- Gas flow is activated
- Meter reading is entered into billing system
Make sure the installation area is easily accessible.
Common Problems and Solutions
Old Application Cancelled:
Reapply using LNG portal.
Missing Documents:
Upload all required files, especially neighbor’s gas bill.
Urgent Delay:
High demand can cause delays. Track status online.
Wrong Portal Used:
Use correct portal based on new or old application.
Benefits of LNG-Based Domestic Gas Connection
- Reliable gas supply
- Online application tracking
- Transparent billing system
- Cleaner energy option
- Reduced dependency on natural gas shortages
Frequently Asked Questions (Apply Online for New Domestic Gas Connection)
How can I apply for a new domestic gas connection in 2025?
Apply online through the official SNGPL LNG portal.
Are old gas applications still valid?
No. All old natural gas applications are cancelled.
What is the minimum fee for LNG connection?
PKR 21,500 for houses up to 5 marla.
How long does meter installation take?
Usually 7–14 working days after approval.
Is LNG safe for domestic use?
Yes, LNG is safe and widely used internationally.
Conclusion
Applying for a new domestic gas connection in 2025 has become fully digital under SNGPL’s LNG policy. By understanding the new rules, preparing correct documents, and applying online through the proper portal, you can avoid delays and secure your joining smoothly. This LNG-based system is designed to provide better supply management, transparency, and long-term energy constancy for Pakistani families.